Lewisham Cyclists' Lewisham Borough Cycling Strategy

Meeting: 29/06/2016 - Sustainable Development Select Committee (Item 7)

7 Lewisham Cyclists' Lewisham Borough Cycling Strategy pdf icon PDF 50 KB

Additional documents:

Minutes:

7.1 This item was discussed after item 8 New waste & recycling services update.

 

7.2 A presentative from Lewisham Cyclists introduced the report. The following key points were noted:

 

·         According to the 2011 census, 2% of journeys in the borough were done by bicycle. The strategy sought to identify and evaluate existing barriers to people cycling to see how they could be improved.

·         The strategy established three main principles to guide future cycling projects: a fully joined up cycle network, safer cycling, and cycling for everyone.

·         There was little provision of cycling routes in the east or south of the borough, as shown on the schematic map on page 61. Lewisham Cyclists had also identified a lack of capacity on the cycling routes between the north and south of the borough.

·         The main aim to improve cycling should be segregated cycling super highways. The A21 road would have space as it was a very wide road. This would be a big project to undertake.

·         The Council was deemed to be good at softer measures to improve provision for cycling in the borough, such as the cycle hire scheme.

 

7.3 Simon Moss (Transport Policy and Development Manager) and Nick Harvey (Cycling Programme Manager) answered questions from the Committee. The following key points were noted:

 

·         Redesigning the A21 would be an ambitious project. It was not clear how much funding Transport for London (TfL) would allocate to such a scheme. The manifesto of the new Mayor of London had mentioned an increased provision for cycling in the capital including prioritising Quiet Ways. Some good ideas about the A21 could be presented positively to TfL.

·         A pinch point in redesigning the A21 to improve provision for cycling would be intersection with the A201 (South Circular). It would also be good to include links with the existing cycling networks in the borough.

·         The strategy was an excellent starting point for improving provision for cyclists in the borough. The Lewisham Cyclists’ strategy presented at the meeting could be used to start the process of developing a Lewisham Cycling Strategy to be formally adopted as Council policy and also referred to in the local development management plan.

·         The Council’s current cycling strategy was contained in the Council’s 2011 Local Implementation Plan (LIP), which was the approach taken by TfL at the time. Now, boroughs were producing separate cycling strategies. The Council’s third LIP was due to be developed in 2017-18 so the timing of this strategy document was excellent.

·         In the meantime, the Council could do some small interventions, such identifying sites for and installing bike hangars. Currently, there were 32 bike hangars across the borough, mostly on land owned by social housing providers. If bike hangars were placed on the public highways, than a change of traffic management orders would have to take place which were very costly to arrange. The Council was building up a list of request for bike hangars that could be used in the future to evidence demand  ...  view the full minutes text for item 7